Update Project Libre with Schedule Information
The following steps should be followed when setting up your Course Project with Project Libre.
Set the basic project informationOpen Project Libre – Click Create Project.
Enter New Project Name, manger, start date, press ok.
Click on File (top left), select calendar and give name
Save as and enter the file name as (your name) cp1. For example, SmithJanecp1.mpp.
Click on the Project Name area and add project task.
Enter Start and Finish Dates
Select information the task and set if fix date
Add other task Click on OK.
Add your durations for each task
Set basic Gantt chart format and select your relationships (use also for tracking Gantt chart view). Select relationships with task that are related
Select a lag if necessary
Set your task dependency by double clicking on the relationship bar.
Click on OK.
Make sure to save your informationNext steps will be to set up resources.
Building a Network Diagram
The first step in building the network diagram is sequencing all of the activities. A completed network diagram enables you to able to determine: (1) a project’s scheduled completion time, (2) the slack or float of project activities, and (3) the critical path of your project.
Build a Project Network (or a Partial Network)
Brainstorm the activities required to complete the work packages. Record on note cards or Post-it notes. Don’t worry about the order or sequence.
Sequence the note cards or Post-it notes with the activities. Determine:The order of activities
Which activities can occur in parallel
Which activities require dependencies
Mandatory: before the activity can begin or end the completion of another task is required.
Discretionary: a best practice or convenience. However, the subsequent task can begin if the discretionary dependency is not completed.
External: requires additional project or process, such as permits.
Internal: dependencies within the control of the project team.
Place the notes on a wall based steps 1 and 2.
Build a network based on step.
I have attached here the project that I have selected and the WBS that I have created. Schedule Creation needs to be done in Project Libre. Its a free tool so you can download it at https://www.projectlibre.com Project is – Project Idea – Renovation of the Local Community Recreation Park for enhancing Social environment and good neighborhood practices. The project is expected to complete within a year and the budget stands at $100,000.
WBS attached