These review questions will broaden your application of a few key topics from the chapters and the Module 7 objectives. Answer all four questions.

  1. What is scheduling and why is sequencing very important in developing schedules? What is available to assist you in developing Gantt, Milestone and Network schedule?
  2. Explain what a network schedule critical path is and why must an operational manager monitor the critical path during schedule performance?
  3. Describe Six Sigma and the Six Sigma DMAIC Process.
  4. Describe the four costs of quality. Explain what each cost is and the two that every operations manager must omit from daily operations. Defend your response with examples.
Module Report Guidelines
  • 750-word minimum, not including Reference or Cover Page
  • Current APA format
  • Double Spaced
  • A minimum of 3 references, in the Reference section at the end of the paper, are required.
    • Two references must be scholarly, peer-reviewed, and from reputable sources.
    • One textbook reference is acceptable.